....
 

FIB Tunnel

Go To BIG PIC View
This "T" shaped tunnel was the entrance to the final night party at an international balloon convention in Athens, Georgia, USA sponsored by Flowers, Inc, Balloons (FIB). The 20 foot by 20 by 8 foot tall foot structure was a "Time Tunnel" with photos of historic people, places and events mounted on the walls.
It took about (550) 18 inch round Micro Foil balloons installed in 12 RMS Super Builders to complete the project. The entrance to the tunnel was trimmed with #260 balloons and Micro Foil stars.
The tunnel was generally self-supporting, but the ground edges of the RMS framework were taped to the floor and several bases with short vertical poles were added at critical points to reinforce the structure against bumps from guests.
 
MORE INFORMATION
   
Related Design Galleries
Visit one or more of the galleries listed in the navigation bar at the top of the page. [Under Construction]
OnLine Directions
Specific directions are not available for online viewing, but do visit RMS Basics and the Banner Tutorial for related information.
Directions In Print
Download plans for the tunnel. View and print with "Acrobat Reader". Available FREE if not already installed in your computer. We suggest that you also download basic Super Builder directions for use with the tunnel plans.
RMS Catalog
Visit the Rouse Custom Shop General Catalog for purchase info on the RMS Super Builder expandable frameworks used to make this design.
RMS Honeycomb Graph Paper
Click to download special RMS honeycomb graph paper to layout your own variations of this design. View and print with "Acrobat Reader". Available FREE if not already installed in your computer.
Search RouseInternational.com
Use our search engine to locate related material within RouseInternational.com.

Contact Rouse International at:   info@RouseInternational.com          Return to Top

.

 

 

Last Updated: 23-January-2003
WebMaster: graham@RouseInternational.com
copyright 2003 Rouse International
URL:
http://RouseInternational.com/galleries/fib.tunnel.01.htm